IOanyT Innovations

Every Year the Replacement Waits, the New Work Waits With It.

Hospitals defer replacing old systems because the estimate keeps growing. Meanwhile connected records, incentives and faster insurer claims wait on the same system. Here are the four options, weighed, and the benchmark for the decision.

By 11 min read Figures checked against their sources on October 11, 2026

The finance committee is looking at a paper titled “Revised estimate”. It is the third paper with that title.

The first figure was approved eighteen months ago, on a list of modules and a demonstration. Since then the old system has been opened, and each opening found more.

The same week, the digital team’s plan for connected patient records and faster insurer claims is put back again. Both need the old system to change, and the old system is waiting for its replacement.

The paradox: The replacement is deferred to keep its cost down, and the work that would bring the hospital something new waits on it.

What We Found

We looked at two things: how replacement estimates behave in the public record, and what India’s digital-health programme and insurance regulator now ask of hospital and insurer systems.

The first figure is rarely the last. In one national government health record replacement in the United States, built on a packaged product, the original contract ceiling has since been raised to well over twice its first figure. Separately, the department now estimates tens of billions of dollars in total to complete deployment into the 2030s, including the cost of keeping the system running (press reporting, 2026). The programme is far beyond anything our readers run. It is simply the clearest public record we found of how far such a figure can travel.

Old systems are larger than any brief. One US healthcare organisation’s old administration system, described in a vendor’s case study, was built on thousands of old terminal screens, many unchanged for decades. An earlier, conventional modernisation effort had converted only a small share of its applications. We do not work in COBOL. We cite it for the scale: nobody holds thousands of screens in mind when a first estimate is made.

India’s digital-health programme now asks for connected records. On 17 July 2026 the National Medical Commission directed medical colleges to implement an “Ayushman Bharat Digital Mission (ABDM)-compliant Health Management Information System (HMIS)” in their hospitals. It published lists of non-compliant medical colleges, including colleges “still not using ABDM-enabled HMIS software”, and warned that its rating board “may initiate further action as per norms”.

There is also a reward for connected records. Under the Digital Health Incentive Scheme, hospitals “earn cash incentives for creating interoperable digital health records”. By 18 June 2026 the scheme had paid hospitals more than 107 crore rupees.

Insurers now work to the hour. The insurance regulator’s circular of May 2024 requires insurers to “decide on cashless authorisation requests within one hour” and to give final authorisation on discharge “within three hours of request from the hospital”.

What our review does not show: The press record does not say why the programme’s figures rose, and we do not say. The Commission’s direction binds medical colleges, not every hospital. The incentive is a reward, not a penalty. The insurers’ time limits bind insurers, not hospitals. No source ties any of them to a deferred replacement. We found no public case of a mid-size hospital, diagnostic chain or pharma company whose replacement estimate grew.

What Waits While the Replacement Is Put Off

A deferred replacement is usually counted as money saved. The question that decides the matter is different: what can the hospital not do while the old system stays as it is?

Connected records. A record system that meets the national standard has to exchange records with the national network. An old system nobody wants to change, because its replacement is “next year”, is a hard place to start.

The incentive. A hospital whose system cannot create interoperable records cannot earn the incentive for creating them.

Faster claims. The insurer’s one-hour and three-hour clocks start with the hospital’s request, and the hospital’s billing system sits behind every request.

The gap we see: judged on its estimate alone, the replacement always waits another year. Set beside the work that waits on the same system, it is a different decision. The opportunity is to start with the parts the new work needs first, so the hospital gains something at each stage and not only on the last day.

This is our reading of the evidence. It is not a measured market figure, and we do not put a rupee value on it here. That figure has to come from your own organisation.

Four Ways to Answer a Replacement That Keeps Waiting, Weighed

OptionWhen it fitsWhat it risks
Defer another year and keep paying to run the old systemA merger or a firm replacement date will settle the question soonThe new work waits, and the estimate does not get better
Approve the whole replacement at once, on one estimateThe system is small, well documented and standardThe whole sum is committed on the least information, and each discovery returns as a revised estimate
Wrap the old system: build the new connections around it and leave its core aloneThe core is sound and only one connection is neededThe new work rests on a core that still ages, and each new piece depends on it
Read the system first, then replace it in stages, starting with the modules the new work needsThe system is old, built for the hospital, and changed for yearsYou pay for the assessment before you know whether you will go ahead, and the figure may be higher than the first estimate

Our recommendation: read the system before any price is set, then replace it one module at a time, starting with the modules the planned digital-health work needs first. Each stage is priced on its own and approved on the evidence of the one before. We do not implement packaged health record products or build the national network’s connections for you; where a stage involves them, your team or supplier does that part.

Where You Are Now, and Where You Should Be

Before the next estimate goes to the committee, we would set a benchmark for the decision itself.

MeasureTypical starting pointWhere it should beHow it is checked
Functions written down before pricingNone; the brief is written from memoryEvery function in scope has its own numbered line before any price is setThe specification
The basis for the estimateA list of modules and a demonstrationA written specification and a risk register, with a price for each stageThe staged plan and quote
The cost of stayingNot written downSet beside the cost of replacing, in one documentThe cost comparison
The new work waiting on the old systemNot linked to any part of itEach planned piece listed against the module it needsThe staged plan
The size of one commitmentThe whole replacement, or nothingOne stage, with the freedom to pause after any accepted moduleThe staged plan and quote
Share of the old system still runningAll of it, until one go-live dayFalling module by moduleReported at every review

The starting points above are what we expect to find. In an engagement they are replaced by your own position, taken in the first review. The targets are what we would work towards with you. They are not results we have already achieved for a healthcare organisation.

How We Work With You

  1. We listen: a free Reliability Review. A first conversation about the old system, the estimate that keeps being revised, and the work that is waiting on it. You leave with a short written note of what we found. You can start with a conversation about the system; we ask for read-only code access only when the assessment begins.
  2. We research. We research your sector, the regulator’s position and what the public record says about firms in your situation. This article is an example of that work.
  3. We read the system and propose: the Legacy System Specification Assessment. It produces a written specification of what the system does, a risk register, a cost comparison between keeping and replacing the system, and a staged plan with a fixed quote. AI does a first pass, our senior engineers review it and trace it to the code, and your own experts confirm it. Code access is read-only and logged, never used for training, and deleted within 30 days of the evaluation ending unless we engage. You get the options and our recommendation.
  4. If you approve, we build. We replace a system one module at a time while the old one keeps running. We never do a single cutover. The work is billed by milestone, each milestone tied to a module you accept, and you can pause after any accepted module. Where a module touches clinical work, accepting it is your clinicians’ decision.
  5. We review against the benchmark. Before work starts we set the benchmark. After each module we show you where each measure stands, and the filled-in benchmark is yours at the end.

The Review is free. Every paid step is fixed price, agreed at scoping. Stop after any step. The findings are yours. The assessment fee is credited in full against the first build stage if it starts within 90 days of the report.

What you need to bring: a budget for the assessment, approved separately from the replacement; read-only access to the code once the assessment begins; and planned hours from the people who use the system every day, clinicians included.

Meeting the Commission’s direction, or any other rule, is your organisation’s own work; we do not offer a compliance service.

What changes for the business:

RoleWhat they gain
CEOA figure the board approves with a basis behind it, and a decision made one stage at a time.
CTO or CIOAn estimate built from what is in the system. Nobody has to own a guess.
CFOA price for each stage and payment for accepted work, in place of an estimate that keeps growing.
COOTraining and running old and new side by side stay in the plan, because no overrun is squeezing them out.
Medical headThe time clinicians must give to the project is known in advance and planned, not taken at short notice.

The cases in this article, and what IOanyT does about that kind of problem:

The caseWhat IOanyT does
A US national government health record programme raised its contract ceiling to well over twice its first figure, and its department now estimates tens of billions of dollars in total, with deployment running into the 2030s (press reporting, 2026).Our part is far narrower than this case. That programme put in a packaged health record product, which we do not implement. For applications an organisation built or had built, we assess before we price, list the unknowns in a risk register, and price each stage on its own.
The National Medical Commission published lists of medical colleges not compliant with its direction on connected records.Our assessment shows which part of the old system stands in the way and what replacing it would take. Meeting the direction is the college’s own work.

IOanyT is a consultancy with its own engineering team: we study the problem, recommend, and prove it by building only what you approve. We price a replacement after we have read the system, so the first figure has a basis and every stage brings something.

Book a free Reliability Review →

Get a fixed quote →

See the Legacy System Specification Assessment →

Sources