IOanyT Innovations
Issue study: Manufacturing Issue study · From the public record

Past the End Date

A study, from the public record, of why manufacturers stay on servers, databases and ERP versions past their end dates: the published dates, one survey of cyber incidents, what holds an old machine in place, the options, what we would advise against, and the benchmark we would set.

By Updated 15 min read Figures checked against their sources on October 12, 2026

1. At a Glance

Issue study · From the public record. No organisation is named here, and IOanyT had no part in anything described. The “case” is the public record: the dates on which makers stop fixing the software beneath a manufacturer’s business, and one survey of what manufacturers report.

Organisation typeManufacturers with their own applications (labels, weighbridge records, costing tools, reports) built beside a packaged ERP, on servers and databases with published end dates
Size bandThe record describes products in general, not firms of a size. Our reader: a mid-size manufacturer whose applications were built in-house or by a partner
RegionThe dates are global. The survey of incidents is of UK manufacturers; the survey of reasons is of US IT professionals. Nothing from India
The decision at stakeWhether to keep renewing paid cover and risk exceptions for old servers, databases and an ERP version, or to find out what holds them in place and deal with that
The public outcomeFor Windows Server 2012 and 2012 R2, paid security updates ended on 13 October 2026. For SQL Server 2012, even the paid updates ended on 8 July 2025. For one widely used older ERP product, mainstream maintenance ended on 31 December 2025 for some versions, with no extension
Why it matters to a mid-size manufacturerAn old machine is usually held in place by the firm’s own applications that stand on it, which nobody has listed. While they are unlisted, the machine cannot be retired and the ERP move cannot be priced

2. The Business Problem, in the Buyer’s Words

“Every year the same line comes back on the risk register: one old server, one old database, exception accepted. Every year we try to upgrade and something stops: last time it was the label program, and the time before that a report nobody could find the code for. Now the ERP has an end date too, and the quotation for the move has a provisional sum for our own programs, because nobody can say how many there are. I am not short of a reason to move. I am short of a list of what we would break.”

These words are imagined. They describe the decision as the research shows it, not a real conversation.

The firm is caught between dates it cannot change and machines it cannot touch. Each failed attempt makes the next one harder to approve, and each year of paid cover or accepted risk ends with the same question.

3. What We Found

Method. We went through the public record on the software beneath a manufacturer’s own applications: the makers’ published support dates for two server operating systems, two databases and one programming tool, one vendor’s article on the maintenance dates of one older ERP product, one news report of a survey of UK manufacturers, and one survey of US IT professionals on why firms do not replace old systems.

The dates beneath the business. These are published by the makers and describe the products in general. Which of them manufacturers run was not part of our research.

ProductPublic record
Windows Server 2012 and 2012 R2Paid security updates ended on 13 October 2026
SQL Server 2012Extended support ended on 12 July 2022; paid updates ended on 8 July 2025
SQL Server 2016Extended support ended on 14 July 2026; paid updates available to 17 July 2029
VB6, a tool some in-house applications were written inThe development tool has been unsupported since 8 April 2008; its maker “strongly recommends that you replace your applications with modern technology”. The runtime is still supported, in a limited way, on current Windows, so VB6 programs have not stopped working
One widely used older packaged ERP productMainstream maintenance ended on 31 December 2025 for some versions, with no extension, and ends on 31 December 2027 for others, with a paid extension to 31 December 2030. The dates are the maker’s; our source is a firm that sells support for the product

What manufacturers report. In one survey of UK manufacturers by an industry body, almost a third said they had a cyber incident over the past year. Of those affected, about three in ten reported reduced production capacity or operational delays, and a similar, separate share reported late deliveries to customers. Only about half have a formal incident response plan. The survey does not say how many of these incidents came through old or unsupported systems. This study suggests no number, and does not say that unsupported software caused any incident.

Why firms do not start. In one survey of about 500 IT professionals in the US, run by a firm that sells software services, half gave the fact that the current system still works as a reason for delaying the replacement of old systems, more than four in ten named budget limitations, more than a third fear of disrupting operations and about a third data migration concerns. The survey covers every sector, not manufacturing alone.

Our reading of what keeps an old machine there. These four are our reasoning from the record above. None is a finding of any source.

  1. Nobody has a list of what stands on each old machine. Applications, scheduled jobs and shared folders were added over years, and the people who added them have left.
  2. One or two applications will not run on anything newer. They were written for the versions of their day, sometimes with a tool its maker no longer supports, and the whole machine waits for them.
  3. The choice is put as everything or nothing. A proposal to deal with one application grows into a replacement of every old system, is too large to approve, and the other option on the table is to change nothing.
  4. For the ERP, the firm’s own additions are unknown to everyone. The specialist can price the product. The custom programs around it are priced as a provisional sum, and after the move nobody can check that everything came across.

What this record does not show. No named manufacturer appears here, because we found none harmed because a server, a database or an ERP version was out of support. The dates describe products, not firms. The survey of incidents covers cyber incidents of every kind and does not link them to old systems. The survey of reasons was run by a vendor and is not about manufacturing. We found no figure for what paid extended cover, an upgrade or an ERP move costs a mid-size manufacturer, or how often an upgrade is abandoned, and nothing from India. The causes above rest on our reasoning. The study uses the record as a lesson about the shape of the problem; it does not claim that mid-size manufacturers have suffered any particular event.

4. The Options a Firm in This Position Had

OptionWhen it fitsWhat it risksOur view
Accept the risk, or buy paid extended cover, and waitThe machine is isolated, cover exists for that version, and a retirement date is already firmCover has its own end date, some versions have none, and nothing about what holds the machine changesRight only as a pause with an end date
Upgrade in place, by the firm’s own teamThe applications on the machine are known to run on the newer versionThe first application that fails stops the upgrade, and whatever else would have failed stays unknownRight once the list exists and shows nothing pins the machine
Rebuild the application that pins the machineThe one or two applications that cannot move are already known by nameWithout a full list, the wrong one is rebuilt, or a second is found after the firstRight, once the list exists
Write down first what stands on each old machine and the custom programs beside the ERP, then rebuild only what pins a machine, one module at a timeNobody holds a full list, the tools are unsupported, earlier attempts stopped, and an ERP move is aheadCosts money before anything changes; old and new run side by side; every old machine is exactly as exposed until the firm’s own team retires itOur recommendation

What we would have advised against: for a firm in this position, renewing the exception or the paid cover year after year with no named piece of work that would end it; a trial upgrade that stops at the first failure and is then called off without recording what failed and why; turning the one application in the way into a proposal to replace every old system and the ERP together; and approving an ERP move whose custom programs carry a provisional sum nobody can explain.

5. Our Recommendation, and the Decision It Asks of the Board

For the applications a manufacturer built or had built beside its ERP: write down first what each one does and what it stands on, the operating system, the database and their published support dates, and name the applications that pin each old machine. Rebuild only those, one module at a time on current technology, with the old application still running until the firm’s own people accept each new module. The firm’s own team then moves what remains and retires the machine. The same specification describes the custom programs beside the ERP, so the firm’s own ERP specialist can price the move against a written scope. IOanyT upgrades nothing in place: the upgrade, the retirement and the ERP move are the firm’s own team’s and its specialist’s work.

The decision it asks of the board: approve a fixed-price assessment now, separately from any upgrade or ERP budget. Then approve each rebuild on its own evidence, with the freedom to pause after any accepted module. The board stops renewing the same exception every year, and starts approving a plan in which the number of machines past their end date is counted and falls.

6. Benchmark: Where You Are Now, and Where You Should Be

These are targets, not results. In an engagement the starting points are replaced by the manufacturer’s own figures, taken in the first review.

MeasureTypical starting pointWhere it should beHow it is checked
Your own applications and what each stands onA label on a machine, and one person’s memoryEvery application listed with the operating system, the database and the support date it stands onThe map of the system and the specification
Applications pinning each old machineFound one at a time, in failed movesNamed for each machineThe risk register
Custom programs beside the ERPPriced as a provisional sumEach specified: what it does, what it reads and writes, and who uses itThe specification
How the ERP move is pricedEach specialist against a different guessThe firm’s own ERP specialist, against the written specificationThe specification, handed over
Applications that pinned a machineKept, untouchedRebuilt one module at a time, each accepted by your own peopleThe traceability matrix and the record of each accepted module
Machines past their end dateNot countedCounted, and falling at each stageReported at every review

7. How IOanyT Would Work

  1. We listen: a free Reliability Review. A first conversation about your applications, the old servers and databases beneath them, and the ERP move ahead. You leave with a short written note of what we found. You can start with a conversation about the system; we ask for read-only code access only when the assessment begins.
  2. We research. We research your sector, the regulator’s position and what the public record says about firms in your situation. This study is an example of that work.
  3. We read the system and propose: the Legacy System Specification Assessment. Here the system is the applications you built or had built beside your ERP, and what each of them stands on. It produces a map of the system as it stands, a written specification of what it does, a risk register, a cost comparison between keeping and replacing the system, and a staged plan with a fixed quote. AI does a first pass, our senior engineers review it and trace it to the code, and your own experts confirm it. Code access is read-only and logged, never used for training, and deleted within 30 days of the evaluation ending unless we engage.
  4. If you approve, we build. We replace a system one module at a time while the old one keeps running. Here that means the applications that pin an old machine, rebuilt on current technology so that your own team can retire the machine. We never do a single cutover. A traceability matrix links every old function to its replacement. The work is billed by milestone, each milestone tied to a module you accept, and you can pause after any accepted module.
  5. We review against the benchmark. Before work starts we set the benchmark. After each module we show you where each measure stands, and the filled-in benchmark is yours at the end.

The Review is free. Every paid step is fixed price, agreed at scoping. Stop after any step. The findings are yours. The assessment fee is credited in full against the first build stage if it starts within 90 days of the report.

8. What the Client Would Own

  • The map and the specification: what the firm’s own applications do and what each stands on, in writing, confirmed by the firm’s own people, including the custom programs beside the ERP.
  • The risk register: what the assessment found, listed before any price is set, including the applications that pin each old machine.
  • The traceability matrix: for every module IOanyT rebuilds, every old function linked to its replacement.
  • The code: the rebuilt modules are the client’s. No runtime or platform fee.
  • The filled-in benchmark: each measure, where it started and where it stands, including how many machines past their end date remain.

9. What This Approach Does Not Cover

  • IOanyT does not upgrade, patch, replace or retire an operating system, a database or a server, and does not sell or arrange extended cover. The manufacturer’s own team does the upgrade and the retirement.
  • Nothing in this approach makes an old machine safe while it is still in use. Until the manufacturer’s own team retires it, it is exactly as exposed as before. IOanyT does not secure or monitor it, and promises no protection from attack.
  • IOanyT does not install, configure, upgrade, convert or move a packaged ERP product, does not change customisations written inside one, and is not a partner of any ERP maker. The manufacturer’s ERP specialist does the move. A program written inside the ERP, in the product’s own language, may be outside what IOanyT reads.
  • IOanyT does not read RPG or COBOL, and does not work on the business computers they run on.
  • IOanyT does not work on plant control systems, machine software or shop-floor control systems.
  • IOanyT does not host applications, and does not move data between databases as a stated service.
  • Reading code may not find every need an application has; some show only when it runs, so the firm’s own upgrade still needs its own testing.
  • This study does not say IOanyT has done this work for a manufacturer. IOanyT has no published case of this work for a manufacturer. The older technologies it reads include VB6, Delphi, AngularJS, PHP 4 to 8, Java 8, .NET Framework and classic ASP.

About this study: IOanyT did not work on this case. It is drawn from published findings, cited below.

10. Sources

SourceUsed for
endoflife.date/windows-serverWindows Server 2012 and 2012 R2 dates
Microsoft lifecycle, SQL Server 2012; SQL Server 2016Database dates
Microsoft, VB6 support statementVB6 support
A vendor’s article, 2025One ERP product’s maintenance dates
News report of an industry body’s survey, 2026UK manufacturers and cyber incidents
A vendor’s survey of about 500 US IT professionals, 2025Why firms delay replacing old systems