A Replacement Plan Needs Stages Someone Can Check. Here Is the Benchmark We Would Set.

Firms promise a replacement date nobody has checked. Here is the benchmark we would set for a staged plan with evidence at each stage, and how the plan is built from the system.

By 10 min read Figures checked against their sources on October 15, 2026

The board has asked when the old system will be replaced.

A paper is drafted. It says the system will be replaced by the end of March. The technology head is asked to confirm the date. It was chosen because it sounds reasonable. Nobody has yet looked at what the replacement involves.

The paper goes to the chief executive for signature. Everyone in the chain knows the date is a hope. Everyone signs.

The paradox: The firm answers a question about control of its systems with a promise it has no means of keeping.

What We Found

We went through the public record on banks whose IT drew regulatory action, both for standing still and for changing badly: the RBI’s published enforcement releases, and the UK regulators’ published findings on one failed migration, from 2018 to 2025.

Standing still has a price. On 24 April 2024 the RBI directed Kotak Mahindra Bank to “cease and desist, with immediate effect, from (i) onboarding of new customers through its online and mobile banking channels and (ii) issuing fresh credit cards”, citing “the continued failure on part of the bank to address these concerns in a comprehensive and timely manner”. The RBI lifted the restrictions on 12 February 2025, about ten months later.

Moving badly has a price too. TSB Bank in the UK migrated to a new IT platform in April 2018, and the migration failed. A significant proportion of its 5.2 million customers were affected, and business as usual returned only in December 2018. On 20 December 2022 its two regulators fined it £48.65 million in total. They found it had failed to manage the risks of its “IT outsourcing arrangements with its critical third-party supplier”.

Penalties reach co-operative banks. On 19 June 2023 the RBI announced a penalty of 65 lakh rupees on Andhra Pradesh Mahesh Co-operative Urban Bank, Hyderabad, by an order of 12 June 2023, for non-compliance with its cyber security framework directions. The RBI said its IT examination and an investigation of a cyber security incident showed the bank “had failed to put in place certain mandated controls which led to the cyber security incident”.

A single date gives the board nothing to check. A plan that says “replaced by March” shows nothing in December except that March has not arrived. If the date slips, the firm holds the old system and a missed commitment.

What our review does not show: We read the RBI’s press releases, not its inspection reports or its letters to the banks. We saw no finding or response letter and do not know what deadlines the RBI sets; the scene above is imagined. TSB is a large UK bank under different regulators. The RBI’s release on Andhra Pradesh Mahesh is about mandated controls; it does not say the bank ran unsupported software. The fourth finding is our own reasoning.

Between Too Slow and Too Fast

The record shows two risks side by side: a restriction where the RBI found concerns not addressed “in a comprehensive and timely manner”, and a fine where a UK migration failed.

The usual answer is a single completion date. It feels like a commitment, and the board gets something to wait for, not something to check. Under pressure the date pushes the work toward a single cutover, the kind of change that fails most publicly.

The gap we see: most replacement plans promise an end date. Few set out stages built from what is actually in the system, with something to show after each. A plan in stages turns a promise into a record the firm and its board can check at every review.

This is our reading. It is not a measured market figure.

Four Ways to Plan the Replacement, Weighed

OptionWhen it fitsWhat it risks
Promise one completion dateThe fix is small and already understoodThe date comes from the calendar, not the system. Missed, it becomes a second problem; rushed, it becomes an incident
Fix each known item one by oneThe items are few and unconnectedEach fix waits on the others. There is no single plan to report against
Commission a compliance auditThe firm wants an independent view of where it stands against the rulesIt confirms what is wrong, not how to replace it. This is not work we do
Read the system, then a staged plan with evidence at each stageThe weak parts sit inside an old, customised systemThe assessment comes before the plan, and the stages run longer than the date the firm would like to give

Our recommendation: read the system before anything is promised, then build a staged plan with evidence at each stage. What the firm tells its regulator, and how, is for the firm and its own compliance advisers. We do not write the response to a regulator, and we cannot promise that a regulator will accept a plan, lift a restriction or withhold a penalty. We are not a compliance or audit firm.

Where You Are Now, and Where You Should Be

This is the benchmark we would set before the first module moves, and fill in as each one is accepted.

MeasureTypical starting pointWhere it should beHow it is checked
An IT inventory of the system in scopePartial, and assembled in a hurryComplete, taken from the system itselfThe record is compared with the servers, databases and code
Each area in the RBI’s 24 April 2024 releaseDescribed from memory, team by teamWhat the system record shows on each, with the weak parts rankedThe risk register
A dated, staged planOne completion date, chosen before the work was knownStages of one module each, dated by the firm from the workThe staged plan with a fixed quote
Evidence for each stageNothing to show until the endA record for every accepted module of what moved and how it was checkedThe traceability matrix
Board reporting”On track” until the date is missedEach stage reported as accepted, open or nextBoard papers, at every review

The starting points above are what we expect to find. In an engagement they are replaced by your own position, taken in the first review. The targets are what we would work towards with you. They are not results we have already achieved for a lender.

The areas are the ones the RBI listed in one bank’s case. Using them as headings is our choice, not a statement of what the RBI expects any firm to show.

A small part of a finished plan might look like this.

StageWhat it removesEvidence
Stage 1: the module with the most exposureThe weak part ranked first in the risk registerTraceability matrix for the module; module accepted
Stage 2: the next moduleThe next weak partTraceability matrix; due on the date the firm set
Stage 3: reportingThe last part on the old systemNot started

The rows above are an illustration, not taken from a real system.

How We Work With You, and What You Are Left With

  1. We listen: a free Reliability Review. A first conversation about the system and what the board has asked. You leave with a short written note of what we found. You can start with a conversation about the system; we ask for read-only code access only when the assessment begins.
  2. We research. We research your sector, the regulator’s position and what the public record says about firms in your situation.
  3. We read the system and propose: the Legacy System Specification Assessment. It produces a map of the system as it stands, a written specification of what it does, a risk register, a cost comparison between keeping and replacing the system, and a staged plan with a fixed quote. AI does a first pass, our senior engineers review it and trace it to the code, and your own experts confirm it. Code access is read-only and logged, never used for training, and deleted within 30 days of the evaluation ending unless we engage.
  4. If you approve, we build. We replace a system one module at a time while the old one keeps running. We never do a single cutover. A traceability matrix links every old function to its replacement. The work is billed by milestone, each milestone tied to a module you accept, and you can pause after any accepted module.
  5. We review against the benchmark. Before work starts we set the benchmark above. As each module is accepted we show you where each measure stands, and the filled-in benchmark is yours at the end.

The Review is free. Every paid step is fixed price, agreed at scoping. Stop after any step. The findings are yours. The assessment fee is credited in full against the first build stage if it starts within 90 days of the report.

This has a price. An assessment comes before the plan, so there is no date to give on day one. We do not secure, patch or maintain the old system meanwhile, or supply security controls. And a staged plan usually runs longer than the date the firm would have liked to give.

At the end you hold the specification, a traceability matrix for each module, and a plan with every stage dated and checked.

What changes for the business:

RoleWhat they gain
CEOA plan to put in front of the board, with stages and visible progress.
CTO or CIOA plan that can be delivered: one module at a time, with the old system still running.
CFORemediation priced stage by stage, each milestone tied to a stage the firm accepts.
CISOEach stage closes named gaps, so the open list gets shorter.
Risk and complianceEvidence of progress at every review, and commitments the firm can keep.

The cases in this article, and what IOanyT does about that kind of problem:

The caseWhat IOanyT does
TSB Bank was fined £48.65 million after a migration that failed.We replace a system one module at a time while the old one keeps running, with a traceability matrix for each module. We never do a single cutover.
Kotak Mahindra Bank was restricted for about ten months.Our assessment gives a firm the facts and a staged plan. What the firm tells its regulator is its own decision.
The RBI penalised Andhra Pradesh Mahesh Co-operative Urban Bank 65 lakh rupees in June 2023 over cyber security controls.Our part is narrower: security controls are the firm’s own work. We give it a staged plan for the systems around its core.

IOanyT is a consultancy with its own engineering team: we study the problem, recommend, and prove it by building only what you approve. The next plan can carry stages the firm is able to keep, and evidence for each.